
In no time at all there were two enormous
piles of brash that needed dealing with.
Alistair and Graham wasted no time.
A fire was soon flickering and making inroads on the brash.
The hedge was being tackled from both sides.
Unfortunately brash from the road side had
to be lifted over the kissing gate.
Not an easy task!
Another issue that had to be dealt with
was the removal of a wire fence.
But hey - what's the removal of a wire fence to the NCVs?
Each hedge tree was protected by a plastic
spiral which had to be removed and collected.
Thanks Will!
The plastic bags of ,often shattered, plastic started to mount up.
In the end there were 6 sacks in the back of Liz's vehicle -
which meant that Graham had to be drafted in to help
transport the two barrels of saws and loppers back to the barn.
Eagle eyed Andy spotted a couple of baby hawthorn trees
so dug them up ready for infilling the gaps in the hedge.
Liz spent a while finding out how long is a piece of string.
Answer - 50m. Now Phil - how many hedge
stakes and rails will she need to buy?
Once the hedge had been prepped
it looked a lot less daunting.
And then it was on to a bit of halo
coppicing of a large hazel tree.
This generated a third pile of brash to
replace one that had just been burnt to ash.
The tree looked a lot better after the job and lifting its crown
will help to prevent the brambles scrambling up into the canopy.
Six little NCVs sitting on a wall....
Coffee and lunchtime was a treat in the sun.
A walk up the hill behind the work area allowed everyone to see
just how big this lovely reserve is. (This is just one corner.)
For years we have been driving past it on the way
to Ripon and never knew it was there!
At the top of the hill was what must be the
UK's smallest war memorial. An unusual use for
an unwanted gate post!!